FAG type Electric chain block with geared trolley
Model |
FAG-0.5 |
FAG-1 |
FAG-2 |
FAG-3 |
Max. working load (ton) |
0.5 |
1.0 |
2 |
3 |
Manufacturer's test load (ton) |
0.625 |
1.25 |
2.5 |
3.75 |
Standard lift (m) |
3 |
3 |
3 |
4 |
Lifting speed
(m/min) |
50Hz |
7.0 |
6.3 |
3.1 |
2.1 |
60HZ |
8.4 |
7.5 |
3.8 |
2.5 |
Trolley Traveling length
driven by pulling hand
chain1m (mm) |
115 |
94 |
81 |
84 |
Hand effort to move geared trolley (kg) |
2 |
3.5 |
5.5 |
8 |
Headroom (mm) |
670(575) |
705(600) |
895(740) |
1010(850) |
I-beam |
Width (mm) |
75 100 125 |
75 100 125 |
100 125 150 |
100 125 150 |
Minimum
radius (mm) |
900 |
1100 |
1200 |
1700 |
Net weight (kg) |
57(60) |
75(79) |
91(98) |
118(125) |
1)The number bracketed in "Net weight (kg)" indicates 6m lift. |
2)The length of power cord in standard is 4 core-0.5m in case of 2 push button, 7 core-0.5m in case of 4 push button. |
3)When you need 4 push button for crane instead of 2 push button, "C" should be added to the end of model name. |
4)Minimum distance is in case of that "I-beam Width (mm)" is minimum. |
5)The number bracketed in "Headroom (mm)" means direct connection. |
|
FBG (3 phase) Electric chain block with electric trolley
Model |
FBG-0.5 |
FBG-1 |
FBG-2 |
FBG-3 |
Max. working load (ton) |
0.5 |
1.0 |
2 |
3 |
Manufacturer's test load (ton) |
0.625 |
1.25 |
2.5 |
3.75 |
Standard lift (m) |
3 |
3 |
3 |
4 |
Lifting speed
(m/min) |
50Hz |
7.0:1.8 |
6.3:1.6 |
3.1:0.9 |
2.1:0.6 |
60HZ |
8.4:2.1 |
7.5:0.9 |
3.8: |
2.5:0.6 |
Trolley Traveling length
driven by pulling hand
chain1m (mm) |
115 |
94 |
81 |
84 |
Hand effort to move geared trolley (kg) |
2 |
3.5 |
5.5 |
8 |
Headroom (mm) |
670(575) |
705(600) |
895(740) |
1010(850) |
I-beam |
Width (mm) |
75 100 125 |
75 100 125 |
100 125 150 |
100 125 150 |
Minimum
radius (mm) |
900 |
1100 |
1200 |
1700 |
Net weight (kg) |
58(61) |
76(80) |
92(99) |
119(126) |
|
1)The number bracketed in "Net weight (kg)" indicates 6m lift. |
2)The length of power cord in standard is 4 core-0.5m in case of 4 push button, 7 core-0.5m in case of 6 push button. |
3)When you need 6 push button for crane instead of 4 push button, "C" should be added to the end of model name. |
4)Short time duty for MAF/MAS is 30 minutes. |
5)Minimum distance is in case of that "I-beam Width (mm)" is minimum. |
6)The number bracketed in "Headroom (mm)" means direct connection. |
|